1. Set up the automatic cutting system according to the actual requirements of the orders;
2. Complete the cutting and drilling at the same time.
3.Use air gun to clean the aluminum scraps of the profile surface and inside, to avoid subsequent processing caused by the scratch.
Installing Accessories And Hardwares
1. Install lock box and drive rod
2. Install handle
3. Install corner code
Frame Assembly
1. Remove the protective film at the corner of the 45-degree profile, clean the oil, and burr of the incision.
2. Assemble the four sides.
3. Fasten four corners with screws.
4. Glue the corner codes.
5. Complete seamless assemble.
6. Install rubber Strips.
7. Install hinge.
8. Fix the sash.
9. Install anti-fall metal rope.
Test & Adjust
The goods need to be tested before shipping, to ensure the handle and hinges opened and locked smoothly, moderate strength.
Quality inspection
1. Check the size, product series and requirements 2. Check the surface of hardware and profile for scratches 3. Check whether the manufacturing process is standard.
Package
1.Frame package: Cotton+Winding film
2.Sash package:Cotton+Heat shrink film
3.Glass:Bubble film + wood frame
دعونا نجعل هذا يحدث
< ر > < ر > ونحن سوف نبذل قصارى جهدنا لبناء العلامة التجارية القوية في العالم